Comprehensive Transportation Plan (CTP)

Draft Environmental Impact Report (Draft EIR)

Comments are welcome via the following methods:

Due to size/download time this plan has been broken into individual sections.  A complete copy is also available at the bottom of this page, but is only recommended for those with a DSL or T1 connection.

Download Acrobat Reader Here These documents are saved in Adobe Acrobat format and you must have Adobe Acrobat Reader to view the reports. Visit our page to download Acrobat Reader.

  Cover 89 k
  Title Page 51 k
  Table of Contents 71 k
1.0 Executive Summary 275 k
2.0 Introduction and Study Approach 194 k
3.0

Overview of the 2009 Comprehensive Transportation Plan

907 k
4.0

Environmental Setting, Impacts, And Mitigation Measures

47 k
  4.1 Aesthetics 1.01 M
  4.2

Air Quality

955 k
  4.3

Traffic and Circulation

2.2 M
  4.4

Biological Resources

2.49 M
  4.5

Cultural Resources

343 k
  4.6

Geology and Soils

1.34 M
  4.7

Hazards and Hazardous Materials

673 k
  4.8 Hydrology and Water Quality 774 k
  4.9

Land Use and Agricultural Resources

1.19 M
  4.10 Noise 859 k
  4.11 Population, Housing and Employment 943 k
  4.12 Public Services 488 k
  4.13 Energy 300 k
5.0

Cumulative Impacts

377 k
6.0 Project Alternatives 636 k
7.0 Long-Term Implications of the Project 159 k
8.0 Report Preparers 59 k
     
Appendices  
  A Notice of Preparation 2.3 M
  B Air Quality Emission Estimates 124 k
  C Biology Database Search 306 k
  D Traffic Noise Modeling 167 k
  E Energy Calculations 271 k
  F Cumulative Green House Gas Emissions 14 k
  G Alternatives Comparison Table 425 k
       