Skip to Content | Accessibility Assistance | Resize Text: decrease font size increase font size reset

Comprehensive Transportation Plan (CTP)

Due to size/download time this plan has been broken into individual sections.  A complete copy is also available at the bottom of this page, but is only recommended for those with a DSL or T1 connection.

Download Acrobat Reader Here These documents are saved in Adobe Acrobat format and you must have Adobe Acrobat Reader to view the reports. Visit our page to download Acrobat Reader.

Chapter 1 INTRODUCTION 190 kb
Chapter 2 EXISTING CONDITIONS 2.21 MB
Chapter 3

FUNDING OPTIONS & CONSTRAINTS

163 kb
Chapter 4

VISION FOR THE FUTURE

270 kb
Appendices A. Lists of Projects  
    i. Strategic Projects 420 kb
   

ii. Road Projects

1.01 MB
   

iii. Transit Projects

129 kb
   

iv. Bicycle Projects

2.6 MB
 

B. Public Outreach Report

995 kb
 

C. Research & Technical Documents

 
   

i. Greenhouse Gas Emissions Reduction White Paper

266 kb
   

ii. Pavement Management

181 kb
   

iii. Transportation & the Built Environment

1.06 MB
    iv. Planning for Safety 287 kb
   

v. Bicycle Facility Types

122 kb
   

vi. Sonoma County Travel Model update & analysis

1.31 MB
 

D. Glossary

360 kb
     
Full copy of Comprehensive Transportation Plan (note: large file size) 9.72 MB